FAKHRUDDIN TEXTILE MILLS LTD | |
(A Sister Concern Of Urmi Group) | |
Gorgoria Masterbari,Sreepur,Gazipur. | |
| | | | |
| Standard Operation Procedure ( SOP) | | |
| | | | |
Buyer Name: Toray Int. | | | | |
Reference no: 21552 | | | |
Style:Kumeri | | | | |
Color: Beige | | | | |
| | | | |
| A. Yarn & Knitting: | | |
| | | | |
Yarn Count & Type | 75D/72F XIAMEN XIANGLU POLY | M/C Dia | 28X28 | |
Elasten Brand & Lot | 20D(CARORA) | Required Dia & GSM | 50" & 120 | |
S/L | 2.7/0.95 | Grey Dia & GSM |
| |
Fabrication | 90%POLYESTER 10% LY S/J | |
| | | | |
| | | | |
| B. Fabric Finishing (Peach & Heat set) : | | |
| | | | |
Peach Program (After Dyeing-Inside peach): | Heat Set Program (Bruckner): | |
Taker-in Tension | 10 kg | Temperature | 195'c | |
Plater Tension | 5 kg | O/Feed | 40-50 | |
Drum Tension & RPM | 22 kg &30 | Speed | 26 m/min | |
Fabric Return | 14Kg | Stretching % | 6% | |
Setting | 100/100 | Chemical | RC-9 | |
Fabric Speed | 18(One time) | Fabric Pass System | 1st By RC-9 , 2nd by pass | |
| | | | |
҉ Important Information to be followed: Entry point tension roller should less cripping, dancing roller pressure 2bar. Elongation after H.set should be (-6%). Peach effect should be same with approved quality swatch. | |
|
| | | | |
| C. Dyeing Process: | | |
| | | | |
Pre-Treatment: | Dyeing Recipe : | Dyeing Process: | Soaping: | |
P.S-1gm/litter Soda-2gm/litter Process-(80X20 min) | Bema. Yellow RS-0.025% Bema. Red RS-0.009% Bema.Blue RS-0.004% | 130X30 min | Dia pol ECO-2gm/litter (80'CX20)min | |
|
|
|
|
|
|
| | | | |
| |
҉ Important Information to be followed: Check wash fastness (3 - 4) before finishing. Stem gradiant strickly mentain &monitor in dyeing.Fabric should be water dried and gumming in Sun-Super before peach finish. | |
| | | | |
| D. Dryer Information and Process: | | |
| | | | |
(Bruckner): | |
Temperature | 160'c | |
O/Feed | 20% | |
Speed | 26 m/min | |
Stretching % | 4% | |
Chemical | 1st padder :Tod heat 2:3%,CTL:0.15%, 2nd padder:HWS:20 gm/litter. | |
| | | | |
҉ Important Information to be followed: Wicking should be check after finish. | |
|
কোন মন্তব্য নেই:
একটি মন্তব্য পোস্ট করুন